
Multi-stage post-renovation cleaning with HEPA vacuuming for a 90 m² designer apartment in a new building in North Tel Aviv, surrounded by active construction.
This apartment in a new North Tel Aviv building had just finished a designer renovation, but the work around it had not. The surrounding buildings were also under construction, so construction dust kept settling on everything, long after the renovation itself was done.
That made dust the central challenge. One cleaning would not have been enough, because dust that is cleaned once simply returns, so we planned the project in several stages. A large part of the work was thorough vacuum cleaning with HEPA filters, which capture fine dust instead of returning it to the air, and dusting every surface in the apartment, from the walls to the parquet.
The designer finishes needed care throughout, and we matched methods and products to each surface so that nothing was damaged in the process.
We also went one step further. We instructed the homeowners on which cleaning products to use in their weekly cleaning, so that the dust that keeps falling inside from the construction around the building would not build up between our visits.
Post-construction cleaning in Tel Aviv. We clean newly renovated apartments and homes in new buildings across Tel Aviv and Gush Dan, including those next to ongoing building sites, and we plan the number of stages around the dust level in each project. Contact us to discuss your apartment.
Result
A 90 m² apartment free of construction dust, with the homeowners equipped to keep it that way.



